Up to 40 tonnes per metre*
Defined in-house test configuration
This reported result demonstrates the potential of a configured solid-panel system under the recorded test arrangement.
*The 40 tonnes-per-metre result was achieved in a defined in-house test configuration. Performance depends on panel dimensions, clear span, support arrangement, load footprint and distribution, material configuration and test method. The applicable design and test record must be confirmed for each project. This result does not imply universal third-party certification.
What changes performance.
Panel length, width and thickness
Clear span
Support arrangement
Load footprint and distribution
Resin and laminate configuration
Test method and acceptance criteria
From requirement to release.
01
Define design load, span, environment and access
02
Configure panel and support arrangement
03
Manufacture with in-process QC
04
Test or review applicable records
05
Complete final release review
Incoming material control
Strict verification of raw resin and reinforcement materials against internal specifications.
Mould and lay-up checks
Regular inspection of mould surface integrity and controlled composite lay-up sequence.
Dimensional inspection
Continuous checks to ensure every lid meets specified project tolerances and fitment.
Surface and edge inspection
Visual and tactile review for uniform surfacing and clean edge profiles.
In-house load testing
Structural verification in a defined test rig to confirm load-bearing performance.
Final QC release
Review of all production records and traceability data prior to inventory dispatch.
Ask for the applicable record.
Share the intended opening, span, support, load case and environment so the relevant configuration and available evidence can be reviewed.